Part L changes, publication and implementation in 2021-22

At Building Regs 4 Plans, we’re preparing for the latest changes to the new Part L, set to apply from June next year (2022). The Government published the Future Buildings Standards consultation document in January. Contained within this document were the interim Part L, Part F and Overheating Regulations for domestic and non-domestic buildings, and the first steps towards the aim to deliver Zero Carbon Ready homes by 2025.

From June 2022, all new homes will be expected to produce 31% less CO2 emissions than is acceptable in the current Part L.

The new proposals include such upgrades as:

  • Waste water heating recovery to ALL showers
  • Heating systems flow temperature to be NO more than 55° C
  • Photovoltaics – proportional to the ground floor area (e.g. 50m² GFA will require 3kW peak solar panels equal to approx. 18m² [assumed to SE/SW orientation])
  • Thermal elements U Values of:
  •              Walls 0.18
  •              Windows 1.2
  •              Floor 0.13
  •              Roof 0.11

The proposals will also encourage the installation of ground source heat pumps which will allow solar panels to be removed from the design and enable greater flexibility in the specified U-Values of the individual thermal elements.

The new Part L is due to be published in December 2021 with an implementation date of June 2022. Developers must submit their Building Notices, Initial Notices or deposit their Full Plans application by June 2022 or comply with the new regulations set out in Approved Document L 2021.

Continuing to register with our site will mean you will always be up-to-date with latest the changes and can easily succeed in achieving building regulations approval. Our unique and easy to use system allows you to draft and submit compliant specifications with the corresponding detail drawings, leading to a finished project in line with the latest Government legislation.

Wood Burning Stoves

When installing a wood burning stove, a flue liner, building a new chimney or re-using an existing flues, if the installer is not a member of a Competent Persons Scheme such as HETAS a building regulations application will have to be submitted to the Local Authority.

Where it is proposed to bring a flue in an existing chimney back into use the flue and the chimney should be given a visual inspection to ensure the flue is free of obstructions such as dislodged birds nests and it should be checked to make sure that it is of the correct the size and type for the appliance you plan to install. The flue may need to be swept and a smoke test may be required. It is possible that the flue may need to be relined.

Notice plates for hearths and flues

After a stove is installed, it is a building regulations requirement to provide a notice plate permanently posted in the dwelling.

The notice plate gives information on the position of the hearth and/or flue, the flue diameter and essential information about the correct use of the appliance (example shown below).

The notice plate should be displayed either:

  • by the electricity consumer meter

  • by the water stop-cock

  • by the hearth or flue that it describes

wood_burning_stove_1

(Reference:  Diagram from Approved Document J)

Checklist

Approved Document J provides a checklist in appendix A which should be filled in by the installer. This checklist helps to ensure that the installation of the stove is satisfactory and should be given to the customer and a copy to Building Control.

Carbon Monoxide Alarm

It is a building regulations requirement to fit a carbon monoxide alarm when installing a wood burning stove. These are usually battery powered.

Alarms should be within one to three meters of the appliance and either:

a) on the celling, or

b) on a wall as high as possible (above doors and windows) but at least 150mm from the celling.

Hearth

The stove should sit on a slab of non-combustible material called a hearth, this will protect any combustible materials underneath and around the stove from heat produced from the stove and any falling burning fuel.

The perimeter of the hearth should be clearly defined by either using a raised edge or by raising the level of the hearth in relation to the floor.

The hearth should extend at least 150mm out from the stove at the sides and 300mm in front.

This 300mm distance can be reduced a slightly if the stove is not designed to operate with the door open. A freestanding stove which is not in a recess should have a hearth at least 840 x 840mm.

wood_burning_stove_2

(Reference:  Diagram from Approved Document J)

Hearth thickness

If the hearth is on a combustible floor it must be at least 125mm thick and have an air gap of 50mm between its underside and the combustible material (see diagram below).. If an air gap is not possible the hearth should be 250mm thick.

wood_burning_stove_3

(Reference:  Diagram from Approved Document J)

If the hearth is on a solid concrete floor slab or pre-cast concrete beam and block floor then the total thickness of the hearth and floor must be at least 250mm or 125mm thick with a 50mm air gap underneath. Again if it can be proven that the stove will not raise the hearth temperature over 100 degrees centigrade then a 12mm hearth may be used (see diagram below).

wood_burning_stove_4

(Reference:  Diagram from Approved Document J)

Outlets from flues and chimneys

Flue gases could present a fire or health hazard, therefore the position of the flue termination is essential. The flue outlet should be positioned high enough above the roof and surrounding buildings to prevent it being affected by wind eddies or down drafts (see diagram below).

The flue outlet position is measured to the top of the chimney pot/terminal or 150mm above the top of the masonry stack enclosing the liner – whichever is the lowest.

wood_burning_stove_5

(Reference:  Diagram from Approved Document J)

Flue outlet heights for combustible roofing material

For roofs covered with combustible materials like thatch or shingles greater clearances are necessary (see Approved Document J).

Flue sizes

The flue size must not be smaller than the size of the stove outlet.

If the stove is smokeless fuelled and not exceeding 20kW the diameter of the flue should not be less than 125mm. However whatever fuel the stove burns if the stove is over 20kW but no more than 30kW the flue must not be less than 150mm in diameter. But it is recommended a flue is a minimum 150mm to ensure the stove is safe to use regardless of the type of fuel used.

Single skin flue pipes

The stove is connected to the chimney via a single skin enamelled steel pipe, this must be at least three its diameter (OD) from combustible materials. For example a 125mm single skin flue pipe must be at least 3 x 125mm = 375mm from combustible materials. Combustible materials must therefore not be within the grey shaded area shown in the diagram below.

wood_burning_stove_6

(Reference:  Diagram from Approved Document J)

It is possible to separate the flue from the combustible material with a non-combustible shield in which case the distance can be reduced to 1.5 times the diameter of the flue from combustible material.

The shield must extend beyond the flue pipe by at least 1.5 times the external diameter of the flue and an air gap at least 12mm must be provided between the shield and the combustible material.

To ensure the chimney can draw effectively it is important to keep the flue pipe as short as possible.

Ventilation for stoves

It is essential that a permanent source of air is provided to allow the smoke to draw up the chimney effectively and allow proper combustion to take place.

Lack of ventilation can cause gases to not fully burn, with the possible result of the production of carbon monoxide, a highly toxic colourless and odourless gas that has potentially fatal consequences.

Ventilation rates are based on the air permeability of the building as well as the rated output of the stove.

Approved Document J provides the minimum standards for permanent supply of air for ventilation. This is particularly important in newer houses where building regulations have ensured buildings are effectively air tight.

In older houses sometimes sufficient air may be already coming through the building which can often be adequate for certain appliances rating and in these cases no additional ventilation is necessary. Ventilation is also not required if the stove draws its air supply directly into the appliance through a duct.

Below is a table from Approved Document J stipulating ventilation requirements for stoves.

wood_burning_stove_7

(Reference:  Diagram from Approved Document J)

The vent should be placed so that the occupier is not bothered by draughts or noise and therefore likely to block the vent.

The vent can be fixed in the walls, ceiling or floor and does not have to be in the same room as the stove. Ventilation can also be provided from another room which itself has permanent ventilation. It is preferable to position it close to the stove to reduce draughts and retain room heat, but should not be placed in the fire place recess, except on the advice of a specialist, as dust or ash might be disturbed by the draughts.

Some vents are available that can be installed using a 125mm core drill. They incorporate a series of baffles inside the duct to reduce wind noise.

Twin wall flue pipe.

A twin walled flue pipe should be designed to suit the appliance and kept a suitable distance away from combustible materials (see diagram below).

There should also be a guard provided where the flue pipe passes through a cupboard, storage space or roof space.

wood_burning_stove_8

(Reference:  Diagram from Approved Document J)

Lining existing chimneys

Flexible Steel liners are made from double skinned, high quality stainless steel. They cannot be used in a new chimney, but are suitable for relining an existing chimney. This type of liner can accommodate bends in the chimney. It is fitted by being lowered down or pulled up the chimney. The liner should be installed in one continuous length with no joints. Coring balls should not be used on a metal flue system.

Factory made relining systems are often clay, ceramics or refactory concrete. The liner is lowered down the chimney on guide ropes with locating bands at the joints.

New Masonry chimney

The most common type of masonry chimneys are brick, block, stone or prefabricated chimney block systems with either clay/ceramic liners or refactory concrete liners.

Masonry chimneys should have liners suitable for the stove that is being fitted. Pumice, clay, or concrete liners can be used. Joints should be kept to a minimum and bends and offsets should be formed only with matching factory made components. Liners need to be placed with the sockets or rebate ends uppermost to contain moisture and other condensates in the flue. Joints should be sealed with fire cement, refractory mortar or as stipulated in the manufacturer’s instructions.

Spaces between the lining and the surrounding masonry should not be filled with ordinary mortar, but with a weak insulating concrete backfill – i.e. leca, vermiculite, or perlite.

All new chimneys must be built on suitable foundations with a damp proof course 150mm above ground level and appropriate weathering where they pass through the roof.

It is essential to have adequate clearance from any combustible material. Joists, floorboard or rafters must be spaced at least 40mm from the chimney outer face or 200mm from the inner surface of the flue.

Factory-made metal chimneys

These systems are used as an alternative to masonry chimneys and consist of interlocking sections with a stainless outer casing.

Access inspection hatches of at least 300mm2 must be provided to enable commissioning and maintenance checks.

If the metal chimney passes through a cupboard, room or roof space it must be guarded to prevent any combustible material being closer than the minimum separation distance mentioned above. Where passing through a floor, manufacturer’s fire stop components must be used to separate the chimney from any timber to maintain the fire resistance.

Part P Electrical Safety

Part P Electrical Safety

In 2005, the Government introduced Approved Document P Electrical Safety into the building regulations (England and Wales). This regulation ensures all domestic electrical installations and alterations made to existing installations (except some types of minor work) are designed and installed to meet the standards set out in the building regulations. Therefore, by law, all homeowners and landlords must be able to prove that all electrical installation work meets the requirements set out in Part P, or they will be committing a criminal offence. Local authorities can instruct you to remove or alter electrical work that does not meet these requirements.

Part P stipulates that when some someone is planning to undertake electrical works they must either:

  • Tell the local building control about the installation in advance so that the council’s building control officer can inspect the work, or
  • Employ an electrician who is registered with one of the five government-approved competent self-certification schemes. The ‘competent person’ must provide a self-certification certificate to the customer and forward a copy to the Local Authority within 30 days.

Competent self-certification schemes.

There are two type of scheme. The first being Full Scope registrations. With this scheme an electrician can register with one of the following bodies; BRE Certification Ltd, British Standards Institution (BSI), ELECSA Ltd, NAPIT Certification Ltd, and NICEIC Certification Services Ltd. The second scheme is called the Defined Scope registration. The bodies which cover this scheme are CORGI, ELECSA, NAPIT, NIC or FTEC. This scheme enables associated trades to carry out a limited amount of electrical work in dwellings as part of their associated work activity. For example: installing new circuits from the consumer unit or adding additional points to existing circuits.

Changes to Part P

In April 2013, the Government made important changes to Part P of the Building Regulations. The two main changes were:

1. The extent of the work that must be checked by a building control body unless undertaken self-certified by an installer registered with a competent person scheme has been reduced.

2. There is now provision to allow the use of a registered third party to certify notifiable work.

From April 2013, electrical work in kitchens or external electrical work will no longer be notifiable apart from installing a new circuit.

Electrical installation work that is now notifiable includes:

A The installation of a new circuit

B) The replacement of a consumer unit or

C) Any addition or alteration to existing circuits in a special location

A special location means:

A) A room containing a bath or shower, the space surrounding a bath tap or shower head where the space extends

  1. vertically from the finished floor level to a height of 2.25M or the position of the shower head where it is attached to a wall or ceiling at a height higher than 2.25 metres from that level and
  2. horizontally where there is a bath tub or shower tray, from the edge of the bath tub or shower tray to a distance of 0.6 metres. Or where there is no bath tub or shower tray from the centre point of the shower head where it is attached to the wall or ceiling to a distance of 1.2 metres.

Part_p

(Reference:  Diagram from Part P Approved Document, 2013)

The requirements of Part P also apply to a room containing a swimming pool or sauna heater.

Non- notifiable work

All other electrical installation work is not notifiable – namely additions and alterations to existing installations outside special locations, and replacements, repairs and maintenance anywhere.

Installing fixed electrical equipment is within the scope of Part P, even if the final connection is by a standard 13A plug and socket, but is notifiable if it involves the installation of a new circuit, the replacement of a consumer unit or work in a special location as described above.

Certification by a registered third party

The second major change relates to the use of a registered third party to certify notifiable work.

Before April 2013, electrical works covered by Part P undertaken by a person not registered with a competent persons’ scheme could only be deemed compliant by local authority building control.

Under the new Part P, the third party certification schemes allows electrical works undertaken by those who are not registered with a competent persons scheme to get the work inspected and tested by a registered third party to confirm that it complies with the building regulations.

Within 5 days of completing the work, the installer must notify the registered third-party certifier who, subject to the results of the inspection and testing being satisfactory, should then, within 30 days, complete an electrical installation condition report and give a copy of the building regulations compliance certificate to the occupier and give the certificate or a copy of the information on the certificate, to the building control body.

It could be considered that the new Part P is really a dumbing-down of standards resulting in incompetent electrician and diyers producing substandard or potentially dangerous work, putting lives at risk.